General Information Notice: This guide summarizes cost-allocation and fee-levying rules under the Owners Corporations Act 2006 (Vic) and the Subdivision Act 1988 (Vic). It is educational information for lot owners and committees, not formal legal advice.
How Multi-OC Developments Work—and Where Money Gets Shifted
In large Victorian residential and mixed-use developments (often 300 to 1,000+ lots), the Plan of Subdivision usually creates multiple Owners Corporations:
- OC No. 1 (The Unlimited Owners Corporation): Covers every lot on the plan and manages shared external areas—such as main driveways, perimeter gardens, central plant, or shared basement ramps.
- OC No. 2, 3, 4+ (Limited Owners Corporations): Each Limited OC covers only a specific subset of lots—for example, Tower A lifts and corridors (OC 2), Tower B lifts and pool (OC 3), or low-rise townhouses (OC 4) that do not use tower lifts or pools.
The Classic Cost-Dumping Trap
Because OC No. 1 collects levies from every lot owner in the development, OC management companies and building managers frequently take the path of least resistance: dumping Limited OC costs onto OC No. 1’s general budget.
Common examples include:
- Charging 80%–100% of the OC management fee or on-site building manager salary to OC No. 1, even though 85% of the manager’s actual workload relates to high-rise tower defects, lift breakdowns, corridor cleaning, and gym/pool fobs in OC No. 2.
- Paying tower-specific foyer air-conditioning, concierge, or vertical-riser maintenance bills out of OC No. 1’s operating account.
- Forcing townhouse or retail lot owners in OC No. 4 (who pay through OC No. 1) to subsidize luxury tower amenities they have zero legal right to access.
1. The Statutory “Benefit Principle” (Sections 24, 28 & 49)
Under Victorian law, an Owners Corporation cannot arbitrarily pool expenses across different OCs for administrative convenience. Three core statutory rules govern who pays:
Rule 1: Ordinary Annual Fees Must Follow Lot Liability (Section 23)
- Under Section 23(3), general annual fees set to cover an Owners Corporation’s approved budget must be levied in proportion to each lot’s Lot Liability as recorded on the Plan of Subdivision. A manager or Committee cannot invent a custom “per-apartment flat fee” for ordinary annual levies.
Rule 2: Extraordinary & Maintenance Costs Must Follow the “Benefit Principle” (Sections 24 & 49)
- Section 24(2A) (Extraordinary Fees): Fees for extraordinary items of expenditure relating to repairs, maintenance, or other works must be levied on the basis that the lot owner of the lot that benefits more pays more (the “Benefit Principle”).
- Section 49 (Cost Recovery for Works Benefiting Specific Lots): Where an Owners Corporation carries out repairs, maintenance, or works that wholly or substantially benefit one or some, but not all, of the lots, the OC must recover the cost from those benefiting lot owners according to the proportion of benefit received.
Rule 3: Limited OCs Cannot Be Subsidized by the Unlimited OC (Subdivision Act s 27C(3))
- Under Section 27C(3) of the Subdivision Act 1988 (Vic), a Limited Owners Corporation is a separate legal entity restricted to managing the common property and functions designated to it on the Plan of Subdivision.
- VCAT Precedent (Ward v Owners Corporation PS723358X-1 [2025] VCAT 823 & Sukeda v Owners Corporation 2 Plan No 529462 [2016] VCAT 533): VCAT has repeatedly confirmed that an Unlimited OC (OC 1) has no legal power to pay for expenses belonging to a Limited OC (OC 2 or 3), and that management/building-management fees must be apportioned using genuine evidence of time and resources spent on each OC.
2. Why “The Budget Passed at the AGM” Is NOT a Legal Shield
When lot owners challenge unlawful cost-shifting, OC managers routinely argue: “The annual budget was approved by majority vote at the AGM, so the cost split is binding.”
VCAT rejects this defense.
- An AGM resolution approving a budget cannot validate an ultra vires (unlawful) expenditure.
- If OC No. 1’s budget includes expenses that lawfully belong to OC No. 2, that portion of the levy is beyond power, and VCAT can order the Owners Corporation to re-calculate the accounts, credit overcharged lot owners, and recover the shortfall from the benefiting Limited OC.
3. How to Audit Your Multi-OC Budget (4-Step Owner Check)
Before your next AGM, request the detailed General Ledger and management fee split under Section 144 and check these four items:
- Inspect the Management & Building Manager Fee Split:
- Compare the percentage of management fees and caretaker/building manager wages billed to OC No. 1 versus OC No. 2, 3, and 4.
- Ask the manager in writing for time-sheet logs or a documented task-allocation breakdown justifying how many hours per week are spent strictly on OC No. 1 common property versus individual towers.
- Check Utility & Embedded Network Metering:
- Confirm whether common-area electricity, gas, and water bills charged to OC No. 1 are separately sub-metered from tower foyer HVAC, pool heating, and tower corridor lighting.
- Verify Insurance Premium Apportionment:
- When a single master building insurance policy covers multiple OCs, check that the insurer or valuer has provided a replacement-value split per OC rather than charging the entire premium to OC No. 1 or splitting it blindly by lot count.
- Match Every Maintenance Invoice to the Plan of Subdivision:
- Pull up the Plan of Subdivision (OC Schedule) from Land Use Victoria. Every door, lift, roof membrane, garden bed, and riser belongs to a specific numbered OC. If an invoice repairs an asset listed under OC No. 2, it must be paid strictly from OC No. 2’s bank account.
Multi-OC Cost Allocation Audit Table
| Expense Item | Common Manager Shortcut (Trap) | Lawful Victorian Standard |
|---|---|---|
| OC Management Base Fee | 70%–90% billed to OC No. 1 (Unlimited) | Apportioned strictly by actual administrative workload per OC. |
| On-Site Building Manager / Concierge | 100% billed to OC No. 1 | Apportioned by verified time/tasks spent on each OC’s facilities. |
| Tower Lifts, Foyers & Pool/Gym | Paid from OC No. 1 general account | Paid 100% by the Limited OC whose lots have access/benefit (s 27C(3)). |
| Shared Driveway, Perimeter & Main Gate | Split unevenly without basis | Paid by OC No. 1 according to Lot Liability (Section 23). |
| Targeted Facade / Balcony Leak Works | Pooled across all lots in OC No. 1 | Charged to benefiting lots under the Benefit Principle (Sections 24 & 49). |